A 145 sqm home renovation includes many trades and decisions. Even if a contractor manages the work, owners benefit from understanding the sequence so they can ask better questions and catch problems earlier.
HOMESEE-Decor can help owners and project teams prepare the design and material package before construction, making the local site workflow easier to coordinate.
Quick Answer
A 145 sqm renovation usually follows measurement, design review, demolition, plumbing and electrical work, early carpentry measurements, tile installation, wall treatment, kitchen and bathroom ceiling, cabinet installation, doors, flooring, lighting, fixtures, and final checks.
Measure and Plan Before Demolition
Record all dimensions, room functions, wall conditions, window sizes, door openings, and utility positions. A professional design check can reduce mistakes before construction begins.
Demolish Only What the Design Requires
Remove non-load-bearing partitions, old doors, old finishes, and outdated systems only after confirming the plan. Keep the site clean so later trades can work safely.
Prioritize Plumbing and Electrical Work
MEP work often sits inside walls or floors, so mistakes create expensive rework. Confirm outlets, lighting, appliances, bathroom fixtures, and kitchen equipment before closing surfaces.
Coordinate Carpentry, Tile and Wall Work
Cabinet measurements, ceiling dimensions, tile levels, wall bases, and paint preparation interact with each other. Early communication helps shorten the schedule.
Inspect Before Final Installation
Check waterproofing, tile slopes, wall flatness, cabinet dimensions, door openings, lighting positions, and hardware before the final stage.
HOMESEE-Decor Planning Note
For overseas owners, designers, developers, and contractors, HOMESEE-Decor can help turn a broad renovation idea into a clearer project package: room-by-room scope, material direction, finish references, quantity discussion, sample coordination, and sourcing support from China. Local code compliance, structural decisions, utility connections, and final installation should still be checked by qualified professionals in the project location.
Final Thoughts
A 145 sqm home renovation runs better when the owner understands the order of work. Good sequencing protects both budget and finish quality.