Skip to content
Interior Design & Construction Materials Supply Project-based service for international clients

Home Renovation Tips

110 sqm Renovation Budget Checklist: Costs, Contracts and Safety Tips

A good renovation budget is more than a single total number. For a 110 sqm home, the budget should show where money goes, what materials are included, what construction methods are required, and which safety items cannot be changed casually during the project.

Quick Answer: What Should a 110 sqm Renovation Budget Include?

A 110 sqm renovation budget should include design fees, demolition, plumbing, electrical work, waterproofing, wall and floor treatment, kitchen and bathroom fixtures, cabinetry, doors, lighting, furniture, appliances, soft decoration, labor, management fees, and a contingency reserve. The quote should be itemized before work starts.

1. Estimate the Total Cost Before Design Details Expand

Before choosing tiles, furniture, or wall finishes, decide the total amount you can comfortably invest. A renovation should match your financial reality, not only the mood board. Visit several renovation companies, compare quotation structures, and ask a designer to optimize the plan based on your budget ceiling.

2. Use a Written Contract, Not Verbal Promises

Every renovation should be supported by a clear contract. The contract should define responsibility, project scope, payment stages, timeline, materials, construction standards, change-order rules, and warranty terms. A quotation sheet should be attached so the construction team cannot freely downgrade materials or change the design standard.

3. Understand Materials and Construction Methods

Homeowners often compare only material names and total price, but construction methods also affect cost. Tile leveling thickness, wood door paint process, waterproof coating layers, wire specification, and wall treatment standards can all change the final price. Ask the contractor to explain the method behind each quote item.

4. Protect Structural Safety

Do not casually remove load-bearing walls, beams, structural columns, or walls between balconies and rooms. Structural changes can reduce building safety and shorten the useful life of the home. If any wall must be modified, confirm it with qualified professionals and local building rules first.

5. Be Careful With Heavy Stone Flooring

Natural marble can look luxurious, but it is heavier than ordinary tiles. Covering a full apartment floor with heavy stone may create unnecessary structural load and cost. If you love stone, use it selectively in entries, feature areas, or bathrooms, and confirm load limits before installation.

6. Prioritize Waterproofing and Copper Wiring

Kitchen and bathroom waterproofing must be tested before the next construction stage. Poor waterproofing is expensive to repair after the home is finished. For electrical work, use proper copper wire and protective conduit where required. Avoid unsafe substitutions that may overheat or create fire risk.

Final Thoughts

The best 110 sqm renovation budget is transparent, realistic, and protective. Spend carefully, but do not save money by weakening safety, waterproofing, wiring, or structural quality. A well-written quote and contract are as important as the design itself.